Infrastructure & Transportation
INFRASTRUCTURE & TRANSPORTATION
Dave Biggers for Louisville Mayor 2026
EXECUTIVE SUMMARY
Louisville’s infrastructure is crumbling and our transportation system forces car dependency while neglecting the needs of people who walk, bike, or take transit. Roads are riddled with potholes. Sidewalks are missing or inaccessible. TARC bus service is inadequate and unreliable. Meanwhile, we’ve spent billions on highways that carved through historic neighborhoods while starving investment in public transit and pedestrian infrastructure.
I believe infrastructure should connect communities, not divide them—and everyone deserves safe, reliable transportation regardless of whether they own a car. While many infrastructure decisions are made at state and federal levels, Louisville Metro controls significant infrastructure investments and can transform our transportation system to serve all residents.
The Challenge
Louisville’s infrastructure and transportation crisis shows up in stark numbers:
Crumbling Infrastructure: Roads, bridges and water lines carry a large backlog of deferred maintenance.
Car Dependency: 73% of Louisville workers drive alone to work (U.S.: 69%), and about 1% take transit (U.S.: about 4%) (U.S. Census Bureau, ACS 2024 1-year). Infrastructure designed for cars, not people.
Transit Inadequacy: TARC carried about 6 million rides in the year ending June 2026, and service has been cut for budget reasons (TARC 2026 Annual Report). Many buses come far apart. No weekend service on many routes. No rapid transit.
Pedestrian & Cyclist Safety: In 2023, 31 pedestrians died on Louisville’s non-interstate roads (Vision Zero Louisville 2023 Annual Report). Almost no protected bike infrastructure.
Infrastructure Inequality: West Louisville streets get paved less often than East End streets, and the East End has more complete sidewalks.
My Vision
I will transform Louisville’s infrastructure and transportation through equitable investment and multimodal planning:
Fix It First ($50M annually): Prioritize maintenance over new construction. Repair roads, bridges, sidewalks with equity lens (invest most in long-neglected neighborhoods).
Dave’s 2018 objection was to paving OVER maintenance — spending on new asphalt while existing roads went unrepaired. Fix-It-First is the same instinct, not its reversal: it is maintenance-first spending, the opposite of the “new paving” Dave was objecting to in 2018.
Complete Streets ($15M annually): Redesign streets to serve all users—pedestrians, cyclists, transit riders, drivers. Prioritize safety over speed.
Transit Transformation ($20M annually): Increase TARC frequency, extend hours, create rapid transit corridors, expand service to underserved areas.
Vision Zero ($8M annually): Eliminate traffic deaths through street redesign, speed reduction, enforcement, education.
Green Infrastructure ($10M annually – delivered with Policy 07; $10M counted there, $0 here): Integrate stormwater management, tree planting, climate resilience into all infrastructure projects.
Budget Impact
This policy requires $93 million in new annual spending—funded through reallocation of highway funds to local streets, federal infrastructure grants, bonding for capital projects, and MSD cost-sharing for green infrastructure.
All proposals fit within Louisville Metro’s $1.13 billion annual operating budget plus dedicated capital funds and federal/state partnerships.
Why This Matters
Infrastructure is economic development. Businesses locate where workers can get to jobs. Crumbling roads cost drivers money in repairs. Transit enables workforce participation for people who can’t afford cars.
Transportation is equity. Low-income residents, elderly, people with disabilities, and children depend on walking, transit, biking. Car-centric infrastructure excludes them.
Safety is a right. 31 pedestrians killed on Louisville’s roads in 2023 alone (Vision Zero Louisville 2023 Annual Report) is a public health crisis. Vision Zero cities use street redesign to make roads safer.
Climate demands transformation. On-road transportation was 18.9% of Louisville’s greenhouse gas emissions in 2016 (Louisville Metro 2016 Community Greenhouse Gas Inventory). We cannot meet climate goals while locking in car dependency.
My infrastructure and transportation agenda will repair what’s broken, invest equitably, serve all users, and build the connected, sustainable Louisville we need.
CURRENT SITUATION: CRUMBLING, CAR-CENTRIC, INEQUITABLE
By the Numbers
Infrastructure Condition:
– Deferred Maintenance Backlog: roads, bridges, sewers and facilities all carry one
Transportation Mode Share (how workers get to work; U.S. Census Bureau, ACS 2024 1-year, Louisville/Jefferson County metro government (balance)):
– Drive Alone: 73% (U.S.: 69%)
– Carpool: 9% (U.S.: 9%)
– Public Transit: 1.3% (U.S.: 3.7%)
– Walk: 1.7% (U.S.: 2.4%)
– Bike: 0.5% (U.S.: 0.5%)
– Work from Home: 12.2% (U.S.: 13.3%)
TARC (Public Transit):
– Ridership: about 6 million total annual rides (TARC 2026 Annual Report)
– Routes: TARC has redesigned its network and cut some service for budget reasons (TARC 2026 Annual Report)
– Frequency: long waits between buses on many routes
– Weekend Service: Limited or nonexistent on many routes
– On-Time Performance: 82% (TARC 2026 Annual Report)
– Operating Expenses: $101.2M in 2025; Mass Transit Trust Fund collections were $77.5M (TARC 2026 Annual Report)
Safety:
– Traffic Deaths: 136 on Louisville’s public roads in 2023, up from 98 in 2019; 110 of the 2023 deaths were on non-interstate roads (Vision Zero Louisville 2023 Annual Report, 2023 figures preliminary)
– Pedestrian Deaths: 31 on non-interstate roads in 2023 (Vision Zero Louisville 2023 Annual Report)
– High-Injury Network: 5% of non-interstate road miles account for 55% of fatal and suspected serious injury crashes (Vision Zero Louisville 2023 Annual Report)
Infrastructure Inequality:
– West Louisville has rougher pavement, fewer sidewalks and less tree canopy than the East End
Major Problems
Problem 1: Deferred Maintenance—Infrastructure Crumbling
Louisville has systematically underfunded infrastructure maintenance for decades, creating a large maintenance backlog:
Roads:
– Many roads in poor condition (potholes, crumbling pavement, failed drainage)
– Roads are resurfaced less often than they should be, so they deteriorate beyond repair before resurfacing
– Once pavement fails, repair costs far more than timely maintenance
Bridges:
– Many built 1950s-70s, reaching end of design life
– Weight restrictions on some bridges (limits economic activity)
Water/Sewer Infrastructure:
– Frequent water main breaks
– Combined sewer system that overflows into local waterways (EPA consent decree)
– Sewer separation is very expensive (MSD responsible, but impacts Metro infrastructure)
Facilities:
– Louisville Metro buildings, parks, community centers aging
– Deferred maintenance: HVAC, roofs, ADA accessibility
– Many facilities 40-60+ years old without major updates
Why deferred maintenance happens:
- New construction politically popular: Ribbon-cutting for new projects; maintenance is invisible
- Short-term budget thinking: Delay maintenance to balance budget this year; pay much more later
- State/federal incentives favor new construction: Grants for highways, not maintenance
- Cumulative neglect: Small delays compound into major backlog
Consequences:
- Economic costs: Drivers pay for vehicle damage from potholes
- Safety: Poor road conditions cause crashes; deficient bridges risk collapse
- Inequality: Neglect concentrated in low-income neighborhoods
- Climate vulnerability: Failed drainage infrastructure exacerbates flooding
Problem 2: Car Dependency—Infrastructure Designed for Cars, Not People
Louisville’s transportation system locks residents into car dependency through infrastructure choices:
Highway dominance:
– I-64, I-65, I-71, I-264, I-265 (Watterson, Snyder Expressways)
– Highways carved through historic neighborhoods (Urban Renewal 1950s-70s): Russell, Smoketown, Shawnee destroyed by interstate construction
– State prioritizes highway expansion over transit, bike, pedestrian infrastructure
Land use patterns:
– Sprawl: Louisville annexation created low-density development requiring cars
– Single-use zoning: Residential separated from commercial/employment
– Parking minimums: Require vast parking lots (subsidizes driving, makes walking/biking unpleasant)
Transit underinvestment:
– TARC operating expenses were $101.2M in 2025, and service was cut for budget reasons (TARC 2026 Annual Report)
– No rapid transit (Bus Rapid Transit, light rail, commuter rail)
– Frequency inadequate: long waits make transit impractical for most trips
– Coverage gaps: Entire areas unserved or underserved
Pedestrian/bike infrastructure minimal:
– Sidewalk network incomplete (more gaps in West Louisville)
– Crosswalks sparse, poorly marked
– Bike lanes: mostly unprotected (paint, not physical separation)
– Dangerous street design: Wide lanes, high speeds, prioritize car throughput over safety
Who suffers:
- Low-income residents: Can’t afford cars; inadequate transit limits job access
- Elderly: Driving ability declines; transit/walkability essential for independence
- People with disabilities: Many can’t drive; need accessible transit and sidewalks
- Children/teens: Can’t drive; need safe walking/biking to school, activities
- Environmental: Car dependency drives emissions, sprawl, climate change
Cost of car dependency:
- Economic exclusion: About 8% of Jefferson County households have no vehicle (U.S. Census Bureau, ACS 2023 1-year, Table B25044); limited job access
- Financial burden: Transportation takes a large share of income for low-income households
- Health: Sedentary lifestyle contributes to obesity, diabetes, heart disease
- Climate: On-road transportation was 18.9% of Louisville’s greenhouse gas emissions in 2016 (Louisville Metro 2016 Community Greenhouse Gas Inventory)
Problem 3: TARC Inadequate and Declining—Public Transit Failing
Louisville’s public transit system is in crisis:
Ridership:
– About 6 million rides in the year ending June 2026 (TARC 2026 Annual Report)
Why ridership declined:
- Frequency cuts: Reduced service frequency to save money; made transit less useful; fewer riders; more cuts (death spiral)
- Coverage cuts: Eliminated routes in low-ridership areas (but left residents stranded)
- Competition from cars: Gas prices low (relative to transit investment); rideshare (Uber/Lyft) provides convenience transit can’t match with 30-60 minute waits
- Perception: Unreliable, slow, uncomfortable; only for people with no other option
Current inadequacies:
Frequency:
– Average headways: 30-60 minutes
– Functional transit: 10-15 minutes (short enough to “just show up” without checking schedule)
– Louisville’s 30-60 minute waits require careful planning; miss bus = 1 hour late
Coverage:
– Routes serve major corridors but miss many neighborhoods
– East End, suburban areas: Minimal service
– West Louisville, South End: Better coverage but still gaps
– Late-night: Almost nothing (limits service industry workers’ ability to get home from evening shifts)
Reliability:
– On-time performance: 82% (TARC 2026 Annual Report)
– Breakdowns common (aging fleet)
– Real-time bus tracking is new (TARC 2026 Annual Report)
Speed:
– Average speed: 12-15 mph (could walk almost as fast)
– No dedicated bus lanes (buses stuck in traffic)
– Frequent stops (every 2-3 blocks slows trips)
Comfort:
– Aging buses (older than they should be)
– Poor accessibility (some buses lack working ramps)
– Shelters: many stops have no shelter (exposed to weather)
Result: Transit is last resort, not viable choice for most residents
Problem 4: Pedestrian & Cyclist Deaths—Streets Designed to Kill
Louisville has a pedestrian safety crisis:
2023: 31 pedestrians killed on non-interstate roads (Vision Zero Louisville 2023 Annual Report)
Why pedestrians die:
- Street design prioritizes speed over safety:
- Wide lanes (12-14 feet) encourage speeding
- Long crossing distances (4-6 lanes common)
- Poor visibility (curves, hills, lack of street lighting)
No refuge islands (pedestrians must cross entire width without rest)
Lack of crosswalks:
- Major roads: Crosswalks 1/2 mile apart (pedestrians cross mid-block dangerously)
- Unmarked crosswalks: Drivers don’t yield
Poor signal timing: Insufficient time for elderly, disabled to cross
High speeds:
- Speed limits on arterials are too high for people on foot (a person’s chance of survival falls as vehicle speed rises; Vision Zero Louisville 2023 Annual Report)
- Design speed often exceeds posted limit (wide lanes, gentle curves encourage speeding)
Minimal enforcement
Driver behavior:
- Distraction (phones)
- Impairment (alcohol, drugs)
- Failure to yield
Where deaths happen:
- High-injury network: 5% of non-interstate road miles account for 55% of fatal and suspected serious injury crashes (Vision Zero Louisville 2023 Annual Report)
- Corridors: Dixie Highway, Preston Highway, Bardstown Road, Broadway
- Concentrated in low-income areas (West Louisville, South End) with worst infrastructure
Cyclist deaths:
– 2-5 annually
– Lack of protected bike infrastructure
– Conflicts with cars at high speeds
Louisville has a Vision Zero goal, but deaths are still rising:
Vision Zero: Swedish traffic safety philosophy adopted by 40+ U.S. cities; goal is ZERO traffic deaths
Principles:
– Deaths/severe injuries are unacceptable and preventable
– Human error is inevitable; infrastructure should protect people
– Speed is key factor; lower speeds save lives
Louisville’s Vision Zero effort is young, and traffic deaths rose from 98 in 2019 to 136 in 2023 (2023 figure preliminary) (Vision Zero Louisville 2023 Annual Report)
Problem 5: Infrastructure Inequality—Neglect Concentrated in Lower-Income Neighborhoods
Louisville’s infrastructure inequality is stark and measurable:
Pavement quality:
– West Louisville average PCI (Pavement Condition Index): 45 (poor)
– East End average PCI: 75 (good)
– West Louisville streets resurfaced every 30-40 years; East End every 15-20 years
Why inequality persists:
- Past policy: Decades of disinvestment, urban renewal and highway construction targeted the same neighborhoods
- Political power: Affluent neighborhoods organize, demand; city responds
- Squeaky wheel gets grease: East End residents complain about potholes; repairs happen quickly
- Funding formulas: Some infrastructure funding tied to property values (higher values = more revenue = better infrastructure)
- Cumulative neglect: Decades of underinvestment compound
Sidewalks:
– West Louisville has more streets without sidewalks than the East End
– ADA accessibility: West Louisville sidewalks often lack curb cuts, have trip hazards
Street lighting:
– West Louisville: Sparse, outdated, many outages
– East End: Well-lit, modern LED streetlights
Drainage:
– West Louisville: Flooding common (inadequate storm sewers, catch basins)
– East End: Better drainage infrastructure
Consequences:
- Safety: Poor infrastructure in West Louisville contributes to higher crash rates
- Economic: Infrastructure quality affects property values, business attraction
- Equity: Residents in neglected neighborhoods pay same taxes but receive inferior services
- Health: Lack of sidewalks discourages walking (obesity, diabetes); flooding creates mold, health hazards
Why Current System Persists
Six factors maintain the status quo:
- State control: Kentucky controls highways, major roads; Louisville has limited authority
- Federal highway funding: Incentivizes road expansion over maintenance/transit
- Political culture: “Cars = freedom”; transit/bike/walk seen as socialist or anti-American
- Fragmented governance: Transit (TARC), sewers (MSD), roads (Metro Public Works), highways (state) lack coordination
- Short-term budgeting: Deferred maintenance saves money this year; costs explode later
- Inequality normalized: Affluent residents ignore infrastructure inequality affecting others
Bottom Line: Without major intervention, infrastructure will continue crumbling, car dependency will deepen, transit will decline, pedestrian deaths will continue, and inequality will worsen.
I will change course.
MY VISION: INFRASTRUCTURE THAT CONNECTS & SERVES ALL
I believe infrastructure should connect communities, not divide them—and everyone deserves safe, reliable transportation regardless of wealth or car ownership.
Core Principles
Fix It First: Maintain what we have before building new. Repair beats replacement.
Equity: Invest most in long-neglected neighborhoods. Repair historical harms.
Multimodal: Serve pedestrians, cyclists, transit riders, drivers—not just cars.
Safety: Vision Zero—accept zero traffic deaths. Design for safety, not speed.
Sustainability: Integrate climate resilience, green infrastructure, emissions reduction into all projects.
Goals (4-Year Term)
By 2029, I will achieve:
✅ 500 miles of roads repaired: Focus on worst-condition streets in West Louisville, South End
✅ 50 bridges rehabilitated: Address most critical structural deficiencies
✅ 100 miles of new sidewalks: Complete gaps. We’ll research where they would benefit people the most, then start there.
✅ TARC ridership doubled: From about 6 million to 12 million annual trips through frequency, coverage, quality improvements
✅ Zero traffic deaths: Vision Zero program reduces fatalities 50% (from 100-120 to 50-60) with goal of elimination
✅ 50 miles of protected bike lanes: Safe cycling network connecting neighborhoods
✅ Rapid transit corridor: Bus Rapid Transit on major corridor (Broadway or Bardstown Road)
DETAILED PROPOSALS
Proposal 1: Fix It First—Equitable Infrastructure Maintenance ($50M Annually)
What It Is
Prioritize maintenance of existing infrastructure over new construction, with equity lens ensuring long-neglected neighborhoods receive investment first.
Three Components:
Component 1: Roads & Pavement ($30M annually)
Equity-based prioritization:
Not first-come-first-served; not political favors; data-driven equity:
- Pavement Condition Index (PCI): Measure all streets; prioritize worst condition
- Equity overlay: Within similar PCI, prioritize neighborhoods with longest time since last resurfacing
- Result: West Louisville streets (PCI 45, 30-40 years since resurfacing) receive priority over East End streets (PCI 65, 15 years since resurfacing)
Annual output:
– 500 miles of streets resurfaced over 4 years (125 miles annually)
– Pothole repairs year-round (48-hour response time in winter)
– Focus: West Louisville, South End, underserved neighborhoods receive 60% of investment
Maintenance strategies:
– Preventive maintenance: Seal coating, crack sealing (extends pavement life at a fraction of the cost of full resurfacing)
– Full-depth reclamation: Recycle existing pavement in place (cheaper, more sustainable than removal/replacement)
– Drainage improvements: Fix underlying drainage issues causing pavement failure
Component 2: Bridges ($15M annually)
Prioritization:
1. Structural deficiency (safety first)
2. Traffic volume (serve most people)
3. Equity (bridges serving low-income neighborhoods prioritized within similar deficiency)
Annual output:
– 12-15 bridges rehabilitated annually (50 over 4 years)
– Focus on structurally deficient bridges limiting emergency response, economic activity
Component 3: Sidewalks & Pedestrian Infrastructure ($5M annually)
Sidewalk completion:
– 100 miles of new sidewalks over 4 years (25 miles annually)
– Priority: schools (safe routes to school) and transit stops (every stop gets sidewalk); for the rest, we’ll research where they would benefit people the most, then start there
ADA accessibility:
– Curb ramps at all intersections
– Repair trip hazards (heaved pavement, tree root conflicts)
– Tactile warnings at crossings (for visually impaired)
Crosswalks:
– High-visibility markings (ladder or zebra striping)
– Rapid-flashing beacons at high-traffic crossings
– Refuge islands on wide streets
Why It Matters
Maintenance is cheaper than replacement:
– Preventive maintenance costs far less than rebuilding a failed road
Equity addresses historical injustice:
– West Louisville has been neglected for decades
– Equity-based investment repairs harms
– All residents deserve quality infrastructure
Economic benefits:
– Good roads save drivers money on vehicle repairs
– Smooth pavement improves freight efficiency
– Quality infrastructure attracts businesses, residents
Safety:
– Smooth pavement reduces crashes
– Sidewalks prevent pedestrian deaths
– Bridge maintenance prevents collapses
Budget
Annual Cost: $50 million
Breakdown:
– Roads/pavement: $30M (125 miles annually)
– Bridges: $15M (12-15 bridges annually)
– Sidewalks/pedestrian: $5M (25 miles sidewalks, 100 crosswalks)
Funding Sources:
– Metro general fund: $20M (reallocation from new construction)
– Federal Infrastructure Act: $15M (maintenance now eligible under new federal law)
– State highway funds (local match): $10M
– Bonding (capital projects): $5M
Cost-Benefit:
– Timely maintenance costs far less than rebuilding roads after they fail
Implementation Timeline
Year 1 (FY2027-28):
– January-March: Conduct comprehensive pavement condition survey
– April-June: Develop equity-based prioritization model
– July-December: Repair 100 miles of roads (focus West Louisville); rehabilitate 10 bridges; install 20 miles sidewalks
Year 2 (FY2028-29):
– 125 miles roads repaired (225 cumulative)
– 12 bridges (22 cumulative)
– 25 miles sidewalks (45 cumulative)
Year 3 (FY2029-30):
– 125 miles roads (350 cumulative)
– 15 bridges (37 cumulative)
– 25 miles sidewalks (70 cumulative)
– West Louisville pavement quality measurably improved
Year 4 (FY2030-31):
– 125 miles roads (475 cumulative)
– 13 bridges (50 cumulative)
– 30 miles sidewalks (100 cumulative)
– Infrastructure inequality significantly reduced
Proposal 2: Complete Streets for All Users ($15M Annually)
What It Is
Redesign streets to serve all users—pedestrians, cyclists, transit riders, drivers—not just cars. Every street project incorporates safety, accessibility, multimodal features.
Complete Streets Policy:
Whenever Louisville repaves a street, reconstructs, or makes major changes:
– Evaluate needs of all users (not just cars)
– Include pedestrian facilities (sidewalks, crosswalks, lighting)
– Include bicycle facilities (bike lanes, preferably protected)
– Include transit features (bus stops with shelters, pull-outs if needed)
– Design for safety (narrower lanes, curb extensions, speed reduction)
– Green infrastructure (bioswales, street trees)
Design elements:
- Narrower travel lanes: 10-11 feet (from 12-14 feet)
- Slows traffic (saves lives)
Creates space for bike lanes, wider sidewalks
Protected bike lanes: Physical separation (curbs, bollards, planters)
- Increases cycling
Protects cyclists from traffic
Curb extensions (bulb-outs):
- Shorten crossing distance
- Increase visibility
Slow turning vehicles
Traffic calming:
- Speed humps, raised crosswalks
- Chicanes (s-curves) on residential streets
Roundabouts (safer than signals)
Street trees & green infrastructure:
- Shade (reduces heat)
- Stormwater management
- Traffic calming (trees create “enclosure,” slowing drivers)
Priority corridors (Complete Streets reconstruction):
- Broadway (downtown to Iroquois Park): Major corridor serving West Louisville
- Bardstown Road (Highlands): Commercial corridor, high pedestrian/bike potential
- Preston Highway (South End): High crash corridor, needs safety improvements
- Dixie Highway: Deadliest road in Louisville, complete redesign
Why It Matters
Safety:
– Complete Streets are designed to make crashes fewer and less deadly
– Narrower lanes = slower speeds = survivable crashes
Equity:
– Low-income residents, elderly, children depend on walking/biking
– Complete Streets provide options beyond car ownership
Economic:
– Walkable streets bring more customers to local shops
– Bikeability attracts young professionals
– Healthier residents (walking/biking reduces obesity, heart disease)
Climate:
– Enabling walking/biking/transit reduces emissions
– Green infrastructure manages stormwater, reduces heat
Budget
Annual Cost: $15 million
Breakdown:
– Major corridor reconstruction (2 corridors annually): $10M
– Neighborhood traffic calming (25 interventions): $3M
– Green infrastructure integration: $2M
Funding Sources:
– Federal Infrastructure Act (Complete Streets eligible): $8M
– Metro capital fund: $5M
– Green infrastructure partnerships (MSD cost-share): $2M
Cost-Benefit:
– Fewer crashes and more foot traffic for local businesses are the payoff
Implementation Timeline
Year 1 (FY2027-28):
– Adopt Complete Streets ordinance
– Redesign Broadway (downtown to Iroquois Park): 5 miles
– 10 neighborhood traffic calming projects
Year 2 (FY2028-29):
– Bardstown Road Complete Streets: 3 miles
– Preston Highway safety improvements: 2 miles
– 25 neighborhood traffic calming projects
Year 3 (FY2029-30):
– Dixie Highway redesign (Phase 1): 3 miles
– Complete Streets Standard applied to all Metro projects
– 25 traffic calming projects
Year 4 (FY2030-31):
– Dixie Highway redesign (Phase 2): 3 miles
– 15 miles Complete Streets corridors total
– Pedestrian fatalities reduced 30-40%
Proposal 3: Transit Transformation—Frequent, Reliable, Useful ($20M Annually)
What It Is
Transform TARC from a last-resort option to a viable choice through increased frequency, extended hours, rapid transit, and expanded coverage.
Five Strategies:
Strategy 1: Frequency Revolution ($8M annually)
Current: 30-60 minute headways (unbearable waits)
New: 15-minute network (frequent enough to “just show up”)
Implementation:
– Identify top 10 routes by ridership
– Double frequency on these routes (from 30 minutes to 15 minutes)
– Covers 60% of current ridership with 40% of routes
Impact:
– More frequent service tends to bring more riders
– Useful for more trip purposes (not just work commutes)
Strategy 2: Extended Service Hours ($4M annually)
Current: Limited evening/weekend service (many routes end 7-8pm; minimal Sunday service)
New:
– All major routes: 6am-midnight daily (including weekends)
– Service industry workers can get home from evening shifts
– Weekend mobility for people without cars
Strategy 3: Bus Rapid Transit (BRT) Corridor ($5M annually)
What is BRT:
– Dedicated bus lanes (buses don’t sit in traffic)
– Signal priority (lights turn green for buses)
– Level boarding (faster stops, accessible)
– Frequent service (5-10 minutes)
– Enhanced stations (like light rail stations)
Louisville BRT corridor (Phase 1):
– Broadway (downtown to West Louisville, Shawnee)
– 8 miles
– 15 stations
– 5-10 minute frequency
– Travel time: 25 minutes (vs. 45 minutes current local bus)
Why Broadway:
– Serves West Louisville (highest transit dependency)
– Connects to major employment downtown
– Wide right-of-way (space for dedicated lanes)
Strategy 4: Coverage Expansion ($2M annually)
Underserved areas:
– East End (Middletown, Douglass Hills, Jeffersontown)
– Outer South End (Fern Creek, Okolona)
– 24-hour routes to airport, hospitals (essential workers)
New routes:
– 5 routes serving currently unserved areas
– Microtransit (small vans, on-demand) in low-density areas
Strategy 5: Service Quality ($1M annually)
Improvements:
– Expand real-time arrival information (apps show when the bus arrives)
– Bus shelters at all major stops (400 new shelters)
– Fleet modernization (electric buses, comfortable seating, A/C, USB charging)
– Customer service (phones answered, complaints resolved)
– Safety (security on buses, well-lit stops)
Why It Matters
Functional transit enables economic participation:
– About 8% of Jefferson County households have no vehicle (U.S. Census Bureau, ACS 2023 1-year, Table B25044)
– Inadequate transit = job access barriers = poverty
Environmental:
– Transit generally emits less CO2 per passenger mile than driving alone
– BRT can take cars off the corridor
Economic development:
– BRT can raise property values near stations
– Attracts businesses, residents who value transit access
Equity:
– Low-income residents, elderly, people with disabilities depend on transit
– Quality transit is civil right
Budget
Annual Cost: $20 million
Breakdown:
– Frequency revolution: $8M (operating costs for doubled frequency)
– Extended hours: $4M
– BRT operations: $5M (federal capital grant covers infrastructure; local match + operations)
– Coverage expansion: $2M
– Service quality: $1M
Funding Sources:
– Federal transit grants: $10M (operating + capital)
– Louisville Metro: $8M (increase in TARC funding)
– Fare revenue increase: $2M (ridership growth increases fares collected)
Cost-Benefit:
– Ridership reaches 12M trips annually
– Fewer car trips mean less congestion, emissions and crashes
Implementation Timeline
Year 1 (FY2027-28):
– Frequency revolution: 5 routes to 15-minute headways
– BRT planning, design, environmental review (Broadway)
Year 2 (FY2028-29):
– Frequency: 10 routes to 15 minutes
– Extended hours on all major routes
– BRT construction begins (Broadway)
Year 3 (FY2029-30):
– BRT opens (Broadway)
– Coverage expansion: 3 new routes
– Ridership: 10 million trips
Year 4 (FY2030-31):
– Full implementation
– Ridership: 12 million trips
– BRT Phase 2 planning (Bardstown Road)
Proposal 4: Vision Zero—Eliminate Traffic Deaths ($8M Annually)
What It Is
Comprehensive program to eliminate traffic deaths through street redesign, speed reduction, enforcement, and education—based on Vision Zero philosophy pioneered in Sweden and adopted by 40+ U.S. cities.
Vision Zero Principles:
- Deaths are unacceptable and preventable
- Human error is inevitable; systems should protect people
- Speed kills; lower speeds save lives
- Data-driven: Focus on high-injury network
Five Pillars:
Pillar 1: High-Injury Network Redesign ($4M annually)
Identify: 5% of non-interstate road miles account for 55% of fatal and suspected serious injury crashes (Vision Zero Louisville 2023 Annual Report)
Louisville’s high-injury network:
– Dixie Highway
– Preston Highway
– Bardstown Road
– Broadway
– Poplar Level Road
Redesign:
– Narrow lanes (slow speeds)
– Protected crosswalks (refuge islands, rapid-flashing beacons)
– Protected bike lanes (separate cyclists from cars)
– Reduce lanes (“road diet”: 4 lanes → 3 lanes + bike lanes = slower, safer)
– Street lighting (visibility)
Output: 50 miles of high-injury network redesigned over 4 years (12-15 miles annually)
Pillar 2: Speed Limit Reduction ($500K annually)
Current: arterial speed limits too high for people on foot (survival chances fall as vehicle speed rises)
New:
– Default speed limit: 25 mph on all streets (unless posted higher)
– Arterials: 30 mph
– School zones: 20 mph (enforced)
Implementation:
– Change ordinance (default speed limit)
– New signage
– Design streets for target speed (narrow lanes, traffic calming)
Pillar 3: Enhanced Traffic Enforcement ($2M annually)
High-visibility police enforcement:
– Focus on high-injury network streets
– Targeted enforcement at dangerous intersections
– Partnership with LMPD Traffic Unit
Traffic calming infrastructure:
– Speed humps and raised crosswalks
– Narrowed lanes and curb extensions
– Improved signage and markings
Pillar 4: Safe Systems Approach ($1M annually)
Assume crashes will happen; design to minimize harm:
- Protected intersections: Separate bike lanes from turning traffic
- Leading pedestrian intervals: Give pedestrians head start before cars get green light
- Daylighting: No parking within 20 feet of crosswalks (improves visibility)
- Refuge islands: Allow pedestrians to cross half the street, wait, then complete crossing
- Roundabouts: Replace high-crash intersections with roundabouts (slower, safer)
Pillar 5: Education & Enforcement ($500K annually)
Education:
– Public awareness campaigns (slow down, yield to pedestrians)
– School programs (safe walking, biking, driving)
Enforcement:
– High-visibility enforcement (police focus on high-injury network)
– Target dangerous behaviors (speeding, failure to yield, DUI, distraction)
Why It Matters
Traffic deaths are preventable:
– 136 people died on Louisville’s public roads in 2023 (preliminary), up from 98 in 2019; 2019-2023 total: 610 (Vision Zero Louisville 2023 Annual Report)
– Engineering > enforcement > education (design saves lives; can’t enforce our way to safety)
Speed is the key:
– The faster the vehicle, the lower a person’s chance of surviving a crash (Vision Zero Louisville 2023 Annual Report)
Equity:
– Low-income neighborhoods have highest death rates (worst infrastructure)
– Vision Zero prioritizes these areas
Economic:
– Traffic crashes cost Louisville money in medical bills, property damage and lost work
– Preventing deaths/injuries saves money
Budget
Annual Cost: $8 million
Breakdown:
– High-injury network redesign: $4M
– Speed limit reduction (signage, traffic calming): $500K
– : $2M (capital + operations; revenue-positive)
– Safe systems approach: $1M
– Education & enforcement: $500K
Funding Sources:
– Federal highway safety grants: $3M
– Metro capital fund: $3M
Cost-Benefit:
– Fewer crashes mean lower medical, property-damage and lost-work costs
Implementation Timeline
Year 1 (FY2027-28):
– Strengthen Louisville’s Vision Zero program
– Identify high-injury network (data analysis)
– Reduce speed limits (ordinance, signage)
– Redesign 10 miles of high-injury network
Year 2 (FY2028-29):
– operational
– Redesign 12 miles (22 cumulative)
– Traffic deaths reduced 15% (from 110 to 94)
Year 3 (FY2029-30):
– Redesign 15 miles (37 cumulative)
– Traffic deaths reduced 30% (from 110 to 77)
Year 4 (FY2030-31):
– Redesign 13 miles (50 cumulative high-injury network)
– Traffic deaths reduced 50% (from 110 to 55)
– Goal: Zero deaths (continuing progress toward elimination)
Proposal 5: Green Infrastructure Integration ($10M Annually – Overlap with Policy 07)
What It Is
Integrate green infrastructure—bioswales, permeable pavement, street trees, rain gardens—into all street projects, addressing stormwater management, urban heat, climate resilience while building transportation infrastructure.
Note: This proposal overlaps with Policy 07 (Environmental Justice & Climate Action). Delivered with Policy 07; $10M counted there, $0 here.
Four Strategies:
Strategy 1: Bioswales & Rain Gardens Along Streets
What they are:
– Vegetated channels capturing and filtering stormwater runoff
– Replace traditional curb/gutter with planted swales
Benefits:
– Reduce sewer overflows (absorb rainfall before entering sewers)
– Filter pollutants (improve water quality)
– Reduce urban heat (vegetation cools)
– Traffic calming (green edge narrows perceived street width, slowing drivers)
Implementation:
– Incorporate into all Complete Streets projects
– Retrofit existing streets in flooding-prone areas
Strategy 2: Permeable Pavement
Applications:
– Parking lanes (absorb runoff)
– Alleys (reduce flooding)
– Sidewalks (allow tree roots to breathe, trees to thrive)
Benefits:
– Reduce runoff
– Recharge groundwater
– Support street trees
Strategy 3: Street Trees
Every street project plants street trees:
– Shade (reduces heat, saves cooling costs)
– Stormwater management (mature trees intercept stormwater)
– Air quality (filters pollution)
– Traffic calming (trees create “enclosure,” slowing drivers)
– Property values (tree-lined streets tend to be more valuable)
Target: 10,000 street trees over 4 years (overlaps with ‘s 50,000 tree goal)
Strategy 4: Green Alley Program
Alleys: Louisville has a large network of alleys (mostly impervious asphalt)
Green alleys:
– Permeable pavement
– Rain gardens at intersections
– Reduce flooding, heat
Output: Convert 50 miles of alleys to green alleys over 4 years
Why It Matters
Stormwater management:
– Green infrastructure absorbs rainfall, reducing sewer overflows
– Can cost less than gray infrastructure (pipe expansion)
Climate resilience:
– Reduces urban heat island (trees, vegetation cool streets)
– Manages increased rainfall from climate change
Co-benefits:
– Beautiful streets (green is more attractive than concrete)
– Traffic calming
– Property values
– Health (shade, air quality)
Cost-effectiveness:
– Green infrastructure can cost less than gray infrastructure for stormwater management
– Provides multiple benefits (gray infrastructure only manages water)
Budget
Annual Cost: $10 million (delivered with Policy 07; $10M counted there, $0 here)
Breakdown:
– Bioswales/rain gardens (100 projects annually): $5M
– Permeable pavement (parking lanes, alleys): $2M
– Street trees (2,500 annually): $2M
– Green alley program (12 miles annually): $1M
Funding Sources:
– MSD (Metropolitan Sewer District) partnership: $5M (green infrastructure reduces sewer overflows; MSD shares cost)
– Federal Infrastructure Act (green infrastructure eligible): $3M
– Metro capital fund: $2M
Cost-Benefit:
– Green infrastructure can save money compared with gray infrastructure
– Co-benefits (heat reduction, property values, air quality) add to the return
Implementation Timeline
Year 1 (FY2027-28):
– 25 bioswale projects
– 2,500 street trees
– 10 miles green alleys
Year 2 (FY2028-29):
– 100 bioswale/rain garden projects
– 2,500 street trees (5,000 cumulative)
– 12 miles green alleys (22 cumulative)
Year 3 (FY2029-30):
– 100 projects
– 2,500 trees (7,500 cumulative)
– 13 miles green alleys (35 cumulative)
Year 4 (FY2030-31):
– 100 projects
– 2,500 trees (10,000 cumulative street trees)
– 15 miles green alleys (50 cumulative)
– Sewer overflows reduced 20% from baseline
BUDGET SUMMARY
Total Annual Cost
| Program | Annual Cost | Notes |
|---|---|---|
| Fix It First (Equitable Maintenance) | $50M | Roads, bridges, sidewalks prioritizing neglected neighborhoods |
| Complete Streets | $15M | Redesign for all users, safety, green infrastructure |
| Transit Transformation | $20M | Frequency, BRT, extended hours, coverage |
| Vision Zero | $8M | Eliminate traffic deaths through engineering, enforcement |
| Green Infrastructure | $0 | Delivered with Policy 07; $10M counted there, $0 here |
| TOTAL (unique spending) | $93M |
Funding Sources
| Source | Amount | Notes |
|---|---|---|
| Metro General Fund / Capital | $35M | Reallocation from new construction to maintenance |
| Federal Infrastructure Act | $29M | Roads, transit, Complete Streets, green infrastructure |
| State Highway Funds (local match) | $10M | Bridge, road maintenance |
| Bonding (Capital Projects) | $5M | Long-term infrastructure investments |
| TARC Fare Revenue Increase | $2M | Ridership growth increases fare revenue |
| Federal Transit Grants | $10M | Transit operations and capital |
| TOTAL | $91M | Note: $2M gap closed through phased implementation |
Note: Green infrastructure ($10M) is counted in Policy 07 (Environmental Justice & Climate Action) budget. Including it here would double-count that spending.
Effective total unique to this policy: $93M annually
Outputs (4-Year Term)
✅ Infrastructure Maintenance:
– 500 miles of roads repaired (focus on West Louisville, underserved areas)
– 50 bridges rehabilitated
– 100 miles of new sidewalks; we’ll research where they would benefit people the most, then start there
– Infrastructure inequality measurably reduced
✅ Complete Streets:
– 15 miles of major corridors redesigned for all users
– 100 neighborhood traffic calming interventions
– Streets serve pedestrians, cyclists, transit riders, not just cars
✅ Transit Transformation:
– TARC ridership reaches 12M annual trips
– 10 routes with 15-minute frequency
– 8-mile Bus Rapid Transit corridor operational (Broadway)
– Service extended to evenings, weekends
– 5 new routes serving underserved areas
✅ Vision Zero:
– Traffic deaths reduced 50% (110 → 55 annually)
– 50 miles of high-injury network redesigned
– Speed limits reduced to 25-30 mph
✅ Green Infrastructure (counted in Policy 07):
– 400 bioswale/rain garden projects
– 10,000 street trees
– 50 miles of green alleys
– Sewer overflows reduced 20%
IMPLEMENTATION TIMELINE (4-YEAR TERM)
Year 1 (FY2027-28): Foundation
Q1:
– Conduct comprehensive pavement condition survey
– Develop equity-based prioritization model for infrastructure investment
– Adopt Complete Streets ordinance
– Strengthen Louisville’s Vision Zero program
Q2:
– Begin road repairs (100 miles, focus West Louisville)
– Broadway Complete Streets design
– Increase TARC frequency on 5 routes
Q3:
– Rehabilitate 10 bridges
– Install 20 miles of new sidewalks
– 10 neighborhood traffic calming projects
– BRT planning (Broadway corridor)
Q4:
– Complete 100 miles road repairs Year 1
– 25 bioswale projects
– Plant 2,500 street trees
– Transit ridership: 7M trips
Year 2 (FY2028-29): Expansion
Q1-Q4:
– Roads: 125 miles repaired (225 cumulative)
– Bridges: 12 rehabilitated (22 cumulative)
– Sidewalks: 25 miles (45 cumulative)
– Bardstown Road Complete Streets reconstruction (3 miles)
– TARC frequency: 10 routes at 15 minutes
– Extended evening/weekend service begins
– BRT construction begins (Broadway)
– Vision Zero: Deaths reduced 15% (110 → 94)
– Green infrastructure: 100 bioswale projects, 2,500 trees
– Transit ridership: 8M trips
Year 3 (FY2029-30): Maturity
Q1-Q4:
– Roads: 125 miles (350 cumulative); West Louisville pavement quality visibly improved
– Bridges: 15 (37 cumulative)
– Sidewalks: 25 miles (70 cumulative); West Louisville approaching 60% completion
– Preston Highway safety improvements (2 miles)
– BRT opens (Broadway): 8 miles, 15 stations, 5-10 minute frequency
– Transit coverage expansion: 3 new routes
– Vision Zero: Deaths reduced 30% (110 → 77)
– High-injury network: 37 miles redesigned
– Transit ridership: 10M trips
Year 4 (FY2030-31): Sustainability
Q1-Q4:
– Roads: 125 miles (475 cumulative—nearly 500-mile goal)
– Bridges: 13 (50 cumulative—goal met)
– Sidewalks: 30 miles (100 cumulative—goal met)
– Dixie Highway redesign Phase 2 (3 miles; 15 miles Complete Streets total)
– Transit ridership: 12M trips (goal met)
– Vision Zero: Deaths reduced 50% (110 → 55)
– High-injury network: 50 miles redesigned
– Infrastructure inequality significantly reduced
– Louisville recognized nationally for equitable infrastructure, multimodal transportation, Vision Zero success
SUCCESS METRICS & ACCOUNTABILITY
Infrastructure Maintenance
✅ Roads Repaired: 500 miles over 4 years (125 miles annually)
✅ Pavement Quality Equity: West Louisville PCI improves from 45 to 60 (33% improvement)
✅ Bridge Safety: 50 structurally deficient bridges rehabilitated
✅ Sidewalk Completion: West Louisville increases from 40% to 60% (20-point improvement)
✅ Maintenance Backlog: Reduced from $2.5B to $2.0B (preventing growth is success)
Complete Streets
✅ Miles Redesigned: 15 miles of major corridors serving all users
✅ Traffic Calming: 100 neighborhood interventions reducing speeds, improving safety
✅ Crashes Reduced: 20-30% reduction on Complete Streets corridors
✅ Economic Activity: Retail sales increase 20% on Complete Streets corridors
✅ Mode Shift: Walking/biking increases 30-50% on Complete Streets
Transit Transformation
✅ Ridership: 12M annual trips
✅ Frequency: 10 routes with 15-minute headways (60% of riders served)
✅ Service Hours: All major routes 6am-midnight, 7 days/week
✅ BRT: 8-mile corridor operational, 5-10 minute frequency
✅ Customer Satisfaction: 80%+ of riders satisfied (vs. current 60%)
Vision Zero
✅ Traffic Deaths: Reduced 50% from 110 to 55 annually (goal: zero)
✅ Pedestrian Deaths: Reduced to 10 annually
✅ High-Injury Network: 50 miles redesigned (100% of identified network)
✅ Speeding: Reduced 50-70% through traffic calming and enforcement
✅ Safe Routes to School: 100% of elementary schools have safe pedestrian access
Equity
✅ Infrastructure Investment: 60% of Fix It First spending in West Louisville, South End
✅ Pavement Quality Gap: Reduced from 30-point gap to 15-point gap (50% improvement)
✅ Sidewalk Gap: West Louisville completion increases 20 points (40% → 60%)
✅ Transit Service: Underserved areas (East End, outer South End) gain 5 new routes
✅ Traffic Safety: Fatality rates equalized (West Louisville currently 2x East End)
RELATED GLOSSARY TERMS
This policy connects to 25+ Infrastructure & Transportation glossary terms on rundaverun.org:
Infrastructure: Infrastructure, Deferred Maintenance, Capital Improvement Program (CIP), Public Works, Pavement Condition Index, Asset Management
Transportation: Transportation, Multimodal Transportation, Mode Share, Vehicle Miles Traveled (VMT), Traffic Congestion
Transit: TARC (Transit Authority of River City), Bus Rapid Transit (BRT), Headway, Transit-Oriented Development, Park and Ride
Streets & Safety: Complete Streets, Vision Zero, Road Diet, Traffic Calming, High-Injury Network, Protected Bike Lane, Pedestrian Safety, Crosswalk
Equity: Transportation Equity, Infrastructure Inequality, Environmental Justice (transportation impacts)
Green Infrastructure: Bioswale, Permeable Pavement, Green Infrastructure, Stormwater Management
FREQUENTLY ASKED QUESTIONS
1. Why prioritize maintenance over new roads? Don’t we need new infrastructure to accommodate growth?
Maintaining what we have is both cheaper and smarter than building new:
Math:
– Preventive maintenance costs far less than full reconstruction, and new construction costs more still
We’re not growing that fast:
– Louisville population: relatively stable (1.3M metro area)
– Not experiencing explosive growth requiring massive new infrastructure
– Sprawl creates more infrastructure to maintain (expensive)
New roads induce demand:
– Build new highway → reduces congestion temporarily → attracts more driving → congestion returns
– This is called “induced demand”—proven in every U.S. city
– Can’t build our way out of congestion
Better investments:
– Maintain existing infrastructure (cheaper, serves current residents)
– Improve transit, walking, biking (gives people options beyond driving)
– Infill development (use existing infrastructure efficiently)
We’ve already over-built:
– Louisville has more lane-miles of road per capita than peer cities
– Problem isn’t lack of roads; problem is maintenance
2. Won’t Complete Streets and narrower lanes cause traffic congestion?
No—evidence shows Complete Streets don’t increase congestion and often improve traffic flow:
Why narrower lanes don’t cause congestion:
- Congestion is caused by volume, not lane width:
- 12-foot lane and 10-foot lane have same capacity (vehicles per hour)
Lane width affects speed (wider = faster), not throughput
Road diets actually reduce congestion:
- Example: 4 lanes → 3 lanes + center turn lane + bike lanes
- Eliminates weaving, lane changes (smoother flow)
- Dedicated turn lane prevents backed-up traffic
Net result: Same or better traffic flow
Complete Streets reduce crashes:
- Crashes cause congestion (lane blockages, rubbernecking)
- Safer streets = fewer crashes = less congestion
Evidence:
- New York City: Narrowed lanes, added bike infrastructure; traffic speed increased (smoother flow)
- Portland: Decades of Complete Streets; congestion comparable to peer cities without Complete Streets
Plus: Louisville doesn’t have significant congestion:
– Average commute: 24 minutes (national average: 27 minutes)
– Congestion is not Louisville’s problem (unlike LA, NYC, DC)
– Some peak-hour slowdowns on major corridors, but functional overall
Complete Streets provide options:
– If driving is slightly slower, people can walk/bike/transit
– Multimodal options reduce car trips (net reduction in congestion)
3. How can Louisville afford $93 million annually for infrastructure when the budget is already tight?
Two points:
Point 1: We’re already spending a lot on infrastructure—just inefficiently:
Current infrastructure spending:
– TARC: $101.2M in operating expenses in 2025; Mass Transit Trust Fund collections were $77.5M that year (TARC 2026 Annual Report)
– Roads, bridges and sidewalks: a mix of Metro, state and federal money
My proposal: $93M Metro investment (plus federal/state partnerships bringing total to ~$200M+)
Difference: Redirecting current spending to prioritize maintenance over new construction, equity over politics, multimodal over car-only.
Point 2: Deferring maintenance costs more:
- Every year we delay maintenance, costs keep growing
- Current approach: Save money this year by deferring maintenance → pay far more later for reconstruction
- My approach: Spend $50M annually on maintenance → save far more over the long term
Deferred maintenance is false economy—pay now or pay far more later.
Revenue sources:
- Federal Infrastructure Act: $29M (federal infrastructure funding I plan to pursue for Louisville)
- Bonding: $5M (borrow for long-term capital, pay back over 20-30 years)
- Reallocated spending: $35M (redirect from ineffective programs, new construction)
- User fees/partnerships: $7M (MSD, TARC fares, parking fees)
- State partnership: $10M (state highways, bridges)
Plus: Infrastructure generates economic returns:
– Good roads attract businesses, increase property values (tax revenue)
– Transit enables workforce participation (income tax revenue)
– Safety reduces crash costs
4. Why invest in transit when hardly anyone uses it? Isn’t that throwing money away?
Hardly anyone uses it BECAUSE it’s inadequate—invest in quality, and people will ride:
Current ridership is LOW because service is BAD:
– 30-60 minute waits (unbearable)
– Doesn’t go where people need (coverage gaps)
– Doesn’t run when people need (limited evening/weekend)
– Unreliable (late, breakdowns)
– Result: Only people with no other option use transit
Improve service → ridership grows:
Louisville opportunity:
– About 8% of Jefferson County households have no vehicle (U.S. Census Bureau, ACS 2023 1-year, Table B25044) → current riders
– Many more households share one vehicle among several adults → potential riders if transit were useful
– Many workers have jobs downtown or on major corridors → BRT could serve them
Many more people would ride if service were frequent, reliable, useful.
Plus: Transit benefits non-riders:
- Reduces traffic congestion: Every bus removes 30-40 cars from road
- Economic development: BRT increases property values, attracts businesses
- Equity: Provides mobility for elderly, people with disabilities, low-income residents
- Climate: Reduces emissions per passenger mile compared with driving alone
- Economic access: Enables workforce participation (people without cars can get to jobs)
Transit investment isn’t only for current riders—it’s to serve the many more people who would ride if service were good.
6. How will equity-based infrastructure prioritization actually work? Won’t politicians still favor wealthy neighborhoods?
Data-driven, transparent prioritization prevents political favoritism:
Equity-based model:
- Objective condition data:
- Pavement Condition Index (PCI) for every street (measured with sensors)
- Bridge inspection reports (engineering data)
Sidewalk condition inventory
Equity overlay:
- Time since last investment (GIS data shows paving history)
Formula-based prioritization:
- Worst condition + longest time since investment = priority
No discretion for politicians to override
Public transparency:
- Publish prioritization model online
- Show every street’s score
- Citizens can verify fairness
Example:
Street A (East End):
– PCI: 65 (fair condition)
– Last resurfaced: 15 years ago
– Neighborhood: Median income $80,000
– Score: 50
Street B (West Louisville):
– PCI: 45 (poor condition)
– Last resurfaced: 35 years ago
– Neighborhood: Median income $30,000
– Score: 95
Street B gets priority (data-driven, objective)
Enforcement:
- Metro Council oversight (quarterly reports on infrastructure investments)
- Community input (residents can challenge prioritization with data)
- Performance metrics (track equity gap over time; hold administration accountable)
Politicians can advocate, but can’t override formula without public justification.
Precedent:
- Los Angeles: Equity metrics for infrastructure; measurable improvements in underserved areas
7. Won’t BRT (Bus Rapid Transit) just be a regular bus with fancy branding? Why not build light rail instead?
BRT is NOT just a regular bus—it’s high-quality rapid transit. And it’s much cheaper than light rail:
BRT features (different from regular bus):
- Dedicated lanes: Buses don’t sit in traffic (like light rail in its own right-of-way)
- Signal priority: Lights turn green for buses (smooth, fast travel)
- Level boarding: Raised platforms, low-floor buses (fast loading, accessible)
- Off-board fare payment: Pay at station before boarding (like light rail)
- Frequent service: 5-10 minutes (comparable to light rail)
- Enhanced stations: Shelters, real-time info, lighting (like light rail stations)
- Branding: Distinct vehicles, route identity (not just “bus”)
Speed:
– BRT runs faster than a regular bus because of dedicated lanes and signal priority
Cost:
– BRT costs much less per mile than light rail
Why not light rail:
Louisville doesn’t have the density or ridership to justify light rail’s cost:
– BRT is right-sized for Louisville
Plus: BRT is flexible:
– Can extend routes beyond dedicated lanes (buses merge into mixed traffic)
– Can change routes if needs change (light rail is permanent)
– Faster to build (2-3 years vs. 10+ years for light rail)
Louisville BRT is right investment:
– Delivers rapid-transit service at much lower cost than light rail
– Can expand network (multiple BRT lines for cost of 1 light rail line)
– Proven effective in similar cities
8. How does green infrastructure integration into street projects actually work? Doesn’t that complicate construction?
Green infrastructure is integrated during street reconstruction—not added complexity, just different design:
Traditional street reconstruction:
1. Remove old pavement
2. Grade and compact subbase
3. Install new pavement
4. Add curb and gutter
5. Install storm drains, catch basins
6. Done
Green infrastructure street reconstruction:
1. Remove old pavement
2. Grade and compact subbase
3. Design curb to create planting areas (bioswales) instead of straight gutter
4. Install new pavement (may use permeable pavement in parking lane)
5. Plant bioswales with native plants, add soil medium
6. Install storm drains (fewer needed; bioswales absorb much of runoff)
7. Plant street trees in tree wells with adequate soil volume
8. Done
Added complexity: Minimal
– Coordination with landscape architect (design planting areas)
– Different materials (plants, soil media instead of just concrete)
– Ongoing maintenance (plants need care) but less infrastructure to maintain (fewer storm drains)
Time:
– Traditional reconstruction: 6-12 months per mile
– Green infrastructure reconstruction: 6-12 months per mile (same)
Cost:
– Green infrastructure costs somewhat more than traditional reconstruction
– But it can reduce the need for expensive pipe expansion in the sewer system
Maintenance:
– Bioswales: Weeding, mulching (2-3 times per year)
– Street trees: Watering (first 3 years), pruning (every 3-5 years)
– Cost: higher annual upkeep than traditional streets
– Benefit: Stormwater management, heat reduction, air quality, beauty
Contractors can handle it:
– Established green infrastructure best practices (manuals, specs)
– Many U.S. cities have done this (Portland, Philadelphia, Seattle)
– Louisville contractors can learn (training, partnering with experienced firms on first projects)
Bottom line: Green infrastructure integration is standard practice in many cities—Louisville can do it too.
9. What about rural/suburban parts of Jefferson County? Will they get neglected in favor of urban infrastructure?
Equity-based infrastructure investment serves entire county—rural, suburban, urban:
Fix It First applies everywhere:
– Worst-condition roads get priority (whether in Shawnee or Fern Creek)
– Bridges throughout county assessed, worst rehabilitated first
– Formula is county-wide, not urban-only
Rural/suburban infrastructure needs:
Different than urban, not neglected:
- Roads:
- Rural roads need maintenance (potholes, drainage, resurfacing)
- Lower traffic volume but still essential (farmers, residents)
Equity formula prioritizes worst condition (rural roads with 30+ years since paving get priority)
Bridges:
- Many structurally deficient bridges in rural areas
- Critical for connectivity (only way across creek/river)
Bridge program targets these
Transit:
- Rural areas don’t need frequent bus service (low density)
- But may benefit from microtransit (on-demand vans)
Park-and-ride lots (drive to transit station, take bus downtown)
Safety:
- Rural roads have high crash rates (curves, narrow lanes, no shoulders)
Vision Zero includes rural road safety (guardrails, rumble strips, curve warning signs)
Drainage:
- Rural flooding common (ditches overwhelmed)
- Green infrastructure (bioswales, culvert upgrades) appropriate
Balance:
- Urban core: Higher density → more transit, bike lanes, pedestrian infrastructure
- Suburbs: Moderate density → some transit, road maintenance, connectivity
- Rural: Lower density → road maintenance, safety improvements, drainage
Everyone gets what they need:
– Not “one size fits all”
– Context-sensitive solutions
– Equity means fair investment proportional to need, not equal spending everywhere
10. What happens to infrastructure investments if future administrations don’t prioritize maintenance?
I will institutionalize infrastructure best practices to outlast my administration:
Structural changes:
- Asset Management System:
- Database tracking condition of every road, bridge, sidewalk
- Maintenance schedules based on data (not politics)
Transparent, public (citizens can hold future administrations accountable)
Dedicated funding:
- Establish infrastructure maintenance fund (separate from general fund)
- Funded by reliable revenue sources (gas tax, vehicle registration fees)
Can’t be raided for other priorities
Performance metrics:
- Annual reporting: Pavement quality, bridge conditions, sidewalk completion
- Public dashboard (like Budget Transparency Dashboard)
Future administrations judged on infrastructure performance
Metro Council oversight:
- Ordinance requiring minimum infrastructure investment (% of budget)
- Council approves infrastructure priorities annually
Not unilateral mayoral discretion
Equity accountability:
- Annual equity audit (infrastructure investment by neighborhood)
- If gaps widen, public pressure and Council intervention
Political sustainability:
- Visible improvements: Residents notice better roads, safer streets; demand continuation
- Constituency: Every neighborhood benefits; broad political support
- Cost savings: Maintenance cheaper than reconstruction; future mayors have fiscal incentive to continue
- National recognition: Louisville gains reputation for infrastructure excellence; political cost of backsliding
Once asset management system, dedicated funding, and transparency are in place, difficult to undo without public outcry.
CONCLUSION: INFRASTRUCTURE THAT CONNECTS, SERVES, AND BUILDS EQUITY
For too long, Louisville has deferred maintenance while our infrastructure crumbled, prioritized highways over transit, designed streets for speed instead of safety, and concentrated neglect in the neighborhoods with the least. This approach has failed: our roads are riddled with potholes, our bridges are structurally deficient, our transit system is barely functional, and pedestrians die on our streets (31 killed in 2023; Vision Zero Louisville 2023 Annual Report).
I believe infrastructure should connect communities, not divide them—and everyone deserves safe, reliable transportation regardless of whether they own a car.
Fix It First will repair 500 miles of roads and 50 bridges—with equity lens ensuring West Louisville and long-neglected neighborhoods receive priority.
Complete Streets will redesign 15 miles of major corridors to serve all users—pedestrians, cyclists, transit riders, drivers—with safety and green infrastructure integrated.
Transit Transformation will double TARC ridership through frequent service, Bus Rapid Transit, extended hours, and expanded coverage—making transit a viable choice, not just a last resort.
Vision Zero will eliminate traffic deaths through street redesign, speed reduction, and data-driven safety improvements—because 136 road deaths in 2023 (preliminary figure) is unacceptable (Vision Zero Louisville 2023 Annual Report).
Green Infrastructure will integrate stormwater management, trees, and climate resilience into all projects—addressing multiple challenges simultaneously.
Infrastructure is economic development. Transportation is equity. Safety is a right. Louisville deserves infrastructure that works for everyone.
I will build the connected, equitable, sustainable Louisville we need.
Related Policy Documents:
– Public Safety & Community Policing
– Criminal Justice Reform
– Health & Human Services
– Budget & Financial Management
– Affordable Housing & Anti-Displacement
– Education & Youth Development
– Environmental Justice & Climate Action
– Economic Development & Jobs (Employee Bill of Rights)
Learn more at rundaverun.org/policy
Dave Biggers for Louisville Mayor 2026
“Democracy that works for everyone.”
RELATED POLICIES
This policy works in coordination with these related initiatives:
- Environmental Justice & Climate Action: Sustainable transportation and green infrastructure advance climate action and environmental justice simultaneously.
- Neighborhood Development: Infrastructure equity fund addresses decades of systematic underinvestment in West Louisville neighborhoods.
- Disability Rights & Accessibility: Universal design and full ADA compliance make infrastructure accessible to all Louisville residents.
- Senior Services: Age-friendly infrastructure and accessible transportation enable seniors to remain independent in their communities.
- Economic Development & Jobs: Infrastructure investment enables economic development and ensures workforce access to employment opportunities.
Explore all 16 comprehensive policies at My Complete Policy Platform.
📍 What This Means for YOUR Neighborhood
Every Louisville neighborhood is unique. Enter your ZIP code to see how this policy directly impacts your community:
💰 See the Budget Impact
Explore how this policy fits into my comprehensive $1.13 billion budget plan:
⚖️ Compare This Policy
See how my approach differs from current administration policies:
⚖️ My Plan, Category by Category
Pick a category to see what my plan does, how it is paid for, and when it arrives.
Public Safety & Policing
My Plan
Approach
- 63 mini substations across Louisville (4-year deployment)
- Officers living and working in communities they serve
- Preventative community policing model
- Year 1: 12 substations in highest-need areas
Mental Health & Wellness
My Plan
Approach
- I will place 18 Community Wellness Centers by health need (CDC PLACES 2024 plus Census poverty data)
- Mental health counseling, addiction support
- Youth programs, family services
- At least one center in every LMPD division
Youth Development
My Plan
Approach
- After-school programs at all substations
- Job training and mentorship
- Arts, sports, and STEM programs
- Youth advisory councils
- Summer employment pathways
Economic Development
My Plan
Approach
- Small business incubators at substations
- Local hiring requirements for city contracts
- Neighborhood-based economic zones
- Affordable housing protection
- Living wage standards
Housing & Affordability
My Plan
Approach
- Expanded affordable housing trust fund
- Strong tenant protections
- Community land trusts
- Rent stabilization measures
- Anti-displacement policies for existing residents
Government Transparency
My Plan
Approach
- Real-time budget dashboard
- Public data portal for all city metrics
- Community advisory boards with veto power
- Open contracting process
- Regular town halls in all neighborhoods
The Choice is Clear
Louisville deserves transformative change, not more of the same. Join us in building a city that works for everyone.
Share This Policy
Help spread the word about my vision for Louisville:
📚 Related Policies You Might Like
How to Vote for Me
I am a write-in candidate: in the race for Mayor, mark the write-in spot and write DAVE BIGGERS (the last name, Biggers, is required).
Early voting, no excuse needed: October 29–31 · Election Day: Tuesday, November 3, 6 AM to 6 PM. Registration for the November 3 election closed October 5.
📧 Stay Updated on This Policy
Get notified when this policy is updated or when I speak about this issue in YOUR neighborhood.
💡 Have Ideas to Improve This Policy?
This is YOUR city. If you have suggestions for how we can make this policy better for Louisville, please share them. Every idea is reviewed.
Suggest an Improvement for Louisville
Have an idea for improving Louisville? Share your policy suggestion below. Your voice matters in shaping our city's future.
NOT ME, WE.
Together, we make Louisville better for everyone.