BUDGET IMPLEMENTATION ROADMAP

Published:
Reading time: 11 min read
Version: 1.0

Quick Navigation

BUDGET IMPLEMENTATION ROADMAP

Version: 2.1.0 | Last Updated: February 2026

Dave Biggers Administration – 4-Year Execution Timeline

Candidate: Dave Biggers
Website: rundaverun.org
Purpose: Detailed roadmap for transforming Louisville’s public safety system over four years

EXECUTIVE SUMMARY

Transformation doesn’t happen overnight. This roadmap shows exactly how Louisville’s public safety system will evolve from January 2026 to January 2030 – with specific timelines, milestones, and accountability measures.

Four-Year Vision:

  • Year 1 (2026): Foundation and early wins
  • Year 2 (2027): Scaling and expansion
  • Year 3 (2028): Full implementation
  • Year 4 (2029): Optimization and sustainability
  • Total Investment: $1.2 billion annually
    Tax Impact: Zero increase
    Approach: Evidence-based, community-driven, professionally managed

    YEAR 1 (2026): FOUNDATION AND EARLY WINS

    January 2026 – December 2026

    Q1 2026 (January – March): IMMEDIATE ACTIONS

    Week 1-4:
    βœ… Inauguration and transition
    βœ… Cabinet confirmation
    βœ… Community Safety Taskforce established
    βœ… Site selection process launched for mini substations
    βœ… Healthcare partnership discussions begun
    βœ… Budget submitted to Metro Council

    Month 2-3:
    βœ… Budget approved by Metro Council
    βœ… First 3 mini substation sites selected
    βœ… Architectural plans commissioned
    βœ… Co-responder pilot program launched (2 teams)
    βœ… Participatory budgeting process begins
    βœ… Union negotiations initiated

    Investments Q1:

  • Planning and design: $2M
  • Co-responder pilot: $500K
  • Community engagement: $150K
  • Q1 Total: $2.65M
  • Metrics Q1:

  • 3 mini substation sites selected
  • 2 co-responder teams operational
  • 100+ community meetings held
  • Budget approved
  • Q2 2026 (April – June): CONSTRUCTION BEGINS

    April:
    βœ… Break ground on first mini substation (West Louisville)
    βœ… Break ground on second mini substation (South End)
    βœ… Break ground on third mini substation (East End)
    βœ… Wellness center partnerships finalized (first 3 locations)
    βœ… Co-responder program expands to 4 teams

    May:
    βœ… Sites 4-6 mini substations selected
    βœ… Wellness center buildout begins (3 centers)
    βœ… Participatory budgeting first round of voting
    βœ… Officer training programs launched
    βœ… Community advisory councils formed

    June:
    βœ… First mini substation construction 50% complete
    βœ… Sites 7-9 selected
    βœ… Co-responder data shows early positive results
    βœ… First wellness center 25% complete
    βœ… Quarterly public report released

    Investments Q2:

  • Mini substation construction: $6M
  • Wellness center buildout: $5M
  • Co-responder expansion: $750K
  • Training programs: $500K
  • Q2 Total: $12.25M
  • Metrics Q2:

  • 3 substations under construction
  • 6 additional sites selected
  • 4 co-responder teams operational
  • 3 wellness centers in buildout
  • First data report showing results
  • Q3 2026 (July – September): FIRST COMPLETIONS

    July:
    βœ… First mini substation completed (soft opening)
    βœ… Community celebration and preview
    βœ… Officer staffing begins at Station 1
    βœ… Second and third substations 75% complete
    βœ… Sites 10-12 selected

    August:
    βœ… First mini substation fully operational
    βœ… 24/7 coverage begins
    βœ… Community response measured
    βœ… Second substation completed
    βœ… First wellness center 75% complete

    September:
    βœ… Third mini substation completed
    βœ… Three substations fully operational
    βœ… Co-responder program expands to 6 teams
    βœ… First wellness center soft opening
    βœ… Participatory budgeting Year 1 projects selected

    Investments Q3:

  • Mini substation completion: $3M
  • Wellness center completion: $3M
  • Co-responder expansion: $500K
  • Operations (3 substations): $500K
  • Q3 Total: $7M
  • Metrics Q3:

  • 12 mini substations operational
  • Response time improvements documented
  • 6 co-responder teams active
  • 1 wellness center opening
  • Community satisfaction surveys positive
  • Q4 2026 (October – December): MOMENTUM BUILDING

    October:
    βœ… First wellness center fully operational
    βœ… Sites 13-15 construction begins
    βœ… Second and third wellness centers 50% complete
    βœ… Year 1 data analysis and report
    βœ… Community town halls in all districts

    November:
    βœ… Substations 4-6 under construction
    βœ… Co-responder program shows measurable impact
    βœ… Participatory budgeting Year 2 planning begins
    βœ… Union partnership agreements finalized
    βœ… National media attention begins

    December:
    βœ… Year 1 comprehensive report released
    βœ… 12 mini substations operational, 9 more in progress
    βœ… 1 wellness center operational, 2 more nearly complete
    βœ… Co-responder data shows 25% reduction in repeat calls
    βœ… Planning for Year 2 acceleration

    Investments Q4:

  • Construction (substations 4-9): $10M
  • Wellness centers 2-3: $4M
  • Operations (3 substations, 1 center): $3M
  • Year 1 evaluation: $200K
  • Q4 Total: $17.2M
  • YEAR 1 SUMMARY

    Completed:
    βœ… 12 mini substations operational
    βœ… 9 additional substations under construction
    βœ… 1 wellness center operational
    βœ… 2 wellness centers nearly complete
    βœ… Co-responder program citywide (6 teams)
    βœ… Participatory budgeting Year 1 complete
    βœ… Union partnerships established

    Total Year 1 Investment: $39.1M
    % of Annual Budget: 3.1% ($39.1M of $1.2B)

    Key Metrics Year 1:

  • 12 substations reducing response times by 70%
  • 1 wellness center serving 500+ residents/month
  • Co-responder teams reducing mental health arrests by 30%
  • 15,000+ residents participating in budgeting process
  • Officer satisfaction improving
  • Community trust building
  • Lessons Learned & Adjustments:

  • Construction timelines
  • Community engagement effectiveness
  • Staffing models
  • Partnership refinements
  • Technology integration
  • YEAR 2 (2027): SCALING AND EXPANSION

    January 2027 – December 2027

    Q1 2027 (January – March): ACCELERATION

    January:
    βœ… Substations 4-6 completed and operational (6 total now)
    βœ… Wellness centers 2-3 open (3 total operational)
    βœ… Co-responder program expands to 10 teams
    βœ… Substations 10-12 construction begins
    βœ… Year 2 budget refinements

    February:
    βœ… Substations 7-9 completed (9 total operational)
    βœ… Wellness centers 4-6 construction begins
    βœ… First year data published in peer-reviewed journal
    βœ… Other cities begin visiting Louisville
    βœ… National recognition growing

    March:
    βœ… Substations 10-12 underway
    βœ… 9 substations showing consistent results
    βœ… 3 wellness centers serving 1,500+ residents/month
    βœ… Co-responder model refined based on data
    βœ… Participatory budgeting Year 2 voting

    Investments Q1:

  • Substations 4-12 completion: $15M
  • Wellness centers 2-6: $12M
  • Operations (9 substations, 3 centers): $8M
  • Co-responder expansion: $1M
  • Q1 Total: $36M
  • Metrics Q1:

  • 9 mini substations operational
  • 3 wellness centers operational
  • 10 co-responder teams active
  • Crime reduction documented in substation areas
  • Hospital ER visits for mental health down 20%
  • Q2 2027 (April – June): VISIBLE TRANSFORMATION

    April:
    βœ… Substations 10-12 completed (12 total operational)
    βœ… Wellness centers 4-6 50% complete
    βœ… Louisville featured in national media
    βœ… Academic partnerships producing research
    βœ… Site selection for substations 13-24

    May:
    βœ… First 12 substations showing measurable crime reduction
    βœ… Community satisfaction at 75%+
    βœ… Officer recruitment improving (better working conditions)
    βœ… Wellness centers serving 2,000+ residents monthly
    βœ… Participatory budgeting projects completed

    June:
    βœ… Substations 13-15 construction begins
    βœ… Mid-term evaluation shows strong results
    βœ… Funding partnerships secured for additional services
    βœ… Louisville cited as national model
    βœ… Tourism/economic development benefits emerging

    Investments Q2:

  • Substations 10-15: $12M
  • Wellness centers 4-6 completion: $8M
  • Operations (12 substations, 3 centers): $12M
  • Expansion planning: $500K
  • Q2 Total: $32.5M
  • Metrics Q2:

  • 12 substations operational (26% of target)
  • 6 wellness centers operational (33% of target)
  • Crime down 15% in areas with substations
  • Response times averaging under 5 minutes
  • Mental health crisis arrests down 40%
  • Q3 2027 (July – September): SUSTAINED GROWTH

    July:
    βœ… Substations 13-18 under construction
    βœ… Wellness centers 4-6 operational (6 total)
    βœ… Co-responder program recognized nationally
    βœ… Grant funding secured from federal programs
    βœ… Private sector partnerships developing

    August:
    βœ… 12 substations showing sustained positive results
    βœ… Community-police relations significantly improved
    βœ… Participatory budgeting Year 3 planning
    βœ… Wellness centers expanding hours based on demand
    βœ… Mobile crisis units piloted

    September:
    βœ… Substations 13-18 nearing completion
    βœ… Louisville hosts national conference on public safety
    βœ… Academic research validating approach
    βœ… Year 2 comprehensive data report
    βœ… Planning for Year 3 final push

    Investments Q3:

  • Substations 13-18: $15M
  • Wellness center operations expansion: $4M
  • Operations (12 substations, 6 centers): $15M
  • Innovation pilots: $1M
  • Q3 Total: $35M
  • Metrics Q3:

  • 18 substations under construction/operational
  • 6 wellness centers serving 3,000+ monthly
  • Citywide crime trends improving
  • Officer retention up 25%
  • Community trust scores rising
  • Q4 2027 (October – December): MOMENTUM

    October:
    βœ… Substations 13-18 completed (18 total operational)
    βœ… Substations 19-24 construction begins
    βœ… Wellness centers 7-12 planning/construction
    βœ… Two-year results exceed projections
    βœ… National recognition continues

    November:
    βœ… 18 substations operational (39% of target)
    βœ… 6 wellness centers operational (33% of target)
    βœ… Citywide transformation visible
    βœ… Economic benefits documented
    βœ… Re-election campaign planning (if applicable)

    December:
    βœ… Year 2 comprehensive report shows strong progress
    βœ… Community celebration events
    βœ… Officer morale surveys positive
    βœ… Budget refinements for Year 3
    βœ… Planning acceleration for final 2 years

    Investments Q4:

  • Substations 13-24 construction: $18M
  • Wellness centers 7-12 planning: $8M
  • Operations (18 substations, 6 centers): $20M
  • Year 2 evaluation: $300K
  • Q4 Total: $46.3M
  • YEAR 2 SUMMARY

    Completed:
    βœ… 18 mini substations operational (39% of total)
    βœ… 6 wellness centers operational (33% of total)
    βœ… Co-responder program citywide and proven
    βœ… Participatory budgeting Year 2 complete
    βœ… National model status achieved
    βœ… Crime reduction documented and sustained

    Total Year 2 Investment: $149.8M
    % of Annual Budget: 11.8%

    Key Metrics Year 2:

  • 18 substations with <5 min avg response times
  • 6 wellness centers serving 3,000+ monthly
  • Crime down 20% in areas with substations
  • Mental health crisis arrests down 50%
  • Officer satisfaction up significantly
  • Community trust at highest level in decade
  • YEAR 3 (2028): FULL IMPLEMENTATION

    January 2028 – December 2028

    Q1 2028: RAPID DEPLOYMENT

    Major Milestones:
    βœ… Substations 19-24 completed (24 total)
    βœ… Substations 25-36 under construction
    βœ… Wellness centers 7-12 operational (12 total)
    βœ… Louisville crime rate at 10-year low
    βœ… National media documentaries

    Investments Q1: $45M

  • Substations: $25M
  • Wellness centers: $15M
  • Operations: $25M
  • Metrics Q1:

  • 24 substations operational (52%)
  • 12 wellness centers operational (67%)
  • Citywide crime down 25%
  • Hospital ER mental health visits down 35%
  • Q2 2028: APPROACHING COMPLETION

    Major Milestones:
    βœ… Substations 25-30 completed (30 total)
    βœ… Wellness centers 13-15 construction
    βœ… Economic development study shows positive impact
    βœ… Louisville becoming destination city
    βœ… Other cities adopting Louisville model

    Investments Q2: $50M

  • Substations: $28M
  • Wellness centers: $12M
  • Operations: $35M
  • Metrics Q2:

  • 30 substations operational (65%)
  • 12 wellness centers serving 5,000+ monthly
  • Response times citywide improving
  • Property values rising in substation areas
  • Q3 2028: THE HOME STRETCH

    Major Milestones:
    βœ… Substations 31-36 completed (36 total)
    βœ… Substations 37-46 final wave begins
    βœ… Wellness centers 13-18 nearing completion
    βœ… Louisville crime at historic low
    βœ… National model fully established

    Investments Q3: $55M

  • Substations: $30M
  • Wellness centers: $15M
  • Operations: $45M
  • Metrics Q3:

  • 36 substations operational (78%)
  • 15 wellness centers operational (83%)
  • Crime down 35% from baseline
  • Community safety perception transformed
  • Q4 2028: ENTERING FINAL YEAR

    Major Milestones:
    βœ… Substations 37-40 completed (40 total)
    βœ… All 18 wellness centers operational
    βœ… Substations 41-46 under construction
    βœ… Louisville as national case study
    βœ… Year 3 shows transformation complete

    Investments Q4: $60M

  • Final substations: $35M
  • Wellness center optimization: $10M
  • Operations: $55M
  • YEAR 3 SUMMARY

    Completed:
    βœ… 40 mini substations operational (87%)
    βœ… All 18 wellness centers operational (100%)
    βœ… Full citywide transformation visible
    βœ… Louisville leading the nation
    βœ… Crime at historic lows
    βœ… Community-police relations transformed

    Total Year 3 Investment: $210M
    % of Annual Budget: 16.5%

    Key Metrics Year 3:

  • 40 substations citywide
  • 18 wellness centers serving 7,000+ monthly
  • Crime down 35-40% from baseline
  • Mental health crisis arrests down 70%
  • Louisville cited in textbooks
  • Economic benefits substantial
  • YEAR 4 (2029): OPTIMIZATION AND SUSTAINABILITY

    January 2029 – December 2029

    Q1 2029: FINAL CONSTRUCTION

    Major Milestones:
    βœ… Substations 41-46 completed
    βœ… ALL 63 substations operational
    βœ… All 18 wellness centers optimized
    βœ… Complete transformation achieved
    βœ… Celebration of promise kept

    Investments Q1: $40M

  • Final 6 substations: $20M
  • System optimization: $5M
  • Operations: $60M
  • Metrics Q1:

  • 63 substations operational (100%)
  • 6 wellness centers operational (100%)
  • Full system functional
  • Results exceeding projections
  • Q2 2029: FULL OPERATION

    Major Milestones:
    βœ… All 63 substations fully staffed
    βœ… All 18 wellness centers at capacity
    βœ… Louisville model replicated in 20+ cities
    βœ… Research showing sustained results
    βœ… Economic benefits clear

    Investments Q2: $35M

  • Operations and optimization: $65M
  • Continuous improvement: $2M
  • Metrics Q2:

  • System fully operational
  • Crime down 35% from 2025
  • Response times under 3 minutes average
  • Community satisfaction at 85%+
  • Q3 2029: SUSTAINABILITY

    Major Milestones:
    βœ… Long-term sustainability planning
    βœ… Next phase innovations
    βœ… Louisville as permanent national model
    βœ… Economic impact study shows major gains
    βœ… Community ownership complete

    Investments Q3: $35M

  • Operations: $65M
  • Innovation fund: $3M
  • Metrics Q3:

  • All systems optimized
  • Continuous improvement ongoing
  • Louisville leading nation
  • Quality of life metrics up
  • Q4 2029: LOOKING FORWARD

    Major Milestones:
    βœ… 4-year transformation complete
    βœ… All promises kept
    βœ… Louisville transformed
    βœ… National model established
    βœ… Planning next evolution

    Investments Q4: $35M

  • Operations: $65M
  • Future planning: $3M
  • YEAR 4 SUMMARY

    Completed:
    βœ… All 63 mini substations operational
    βœ… All 18 wellness centers operational
    βœ… Complete transformation of public safety
    βœ… Louisville as national model
    βœ… Crime at historic lows
    βœ… Community thriving

    Total Year 4 Investment: $145M
    % of Annual Budget: 11.4%

    Key Metrics Year 4:

  • 100% implementation complete
  • Crime down 35% from 2025 baseline
  • Response times under 3 minutes
  • Community-police relations excellent
  • Economic benefits substantial
  • Louisville model copied nationwide
  • 4-YEAR TOTALS

    Infrastructure Built:

  • 63 mini police substations
  • 18 wellness centers
  • Citywide co-responder program
  • Participatory budgeting system
  • Community partnerships
  • Total 4-Year Investment:

  • Year 1: $39.1M (3.1%)
  • Year 2: $149.8M (11.8%)
  • Year 3: $210M (16.5%)
  • Year 4: $145M (11.4%)
  • Total: $543.9M over 4 years
  • Average: $136M per year (10.7% of $1.2B budget)
  • Results Achieved:

  • Crime reduction: 35%
  • Response times: <3 minutes average
  • Mental health crisis arrests: Down 70%
  • Hospital ER mental health: Down 40%
  • Community satisfaction: 85%+
  • Officer retention: Up 35%
  • Economic development: Measurable
  • National recognition: Achieved
  • Promises kept: 100%
  • ACCOUNTABILITY MEASURES

    Monthly Public Reports:

  • Construction progress
  • Operational metrics
  • Financial status
  • Community feedback
  • Crime statistics
  • Response time data
  • Quarterly Comprehensive Reviews:

  • Implementation timeline
  • Budget adherence
  • Outcome metrics
  • Lessons learned
  • Adjustments needed
  • Community input
  • Annual Major Assessments:

  • Independent evaluation
  • Financial audit
  • Community survey
  • Academic research
  • Comparative analysis
  • Strategic planning
  • RISK MITIGATION

    Construction Delays:

    Mitigation: Conservative timelines, backup contractors, weather contingencies
    Response: Transparent communication, focus on operational wins, adjust schedule

    Budget Overruns:

    Mitigation: Detailed cost estimates, contingency funds, regular audits
    Response: Reallocate within budget, phase adjustments, maintain transparency

    Community Resistance:

    Mitigation: Extensive engagement, flexible site selection, responsive adjustments
    Response: Listen and adapt, show results, build trust through transparency

    Staffing Challenges:

    Mitigation: Competitive pay, training programs, career development
    Response: Recruitment campaigns, retention bonuses, workflow adjustments

    Technology Issues:

    Mitigation: Proven systems, extensive testing, vendor support
    Response: Backup systems, rapid troubleshooting, user training

    SUCCESS FACTORS

    What Makes This Work:

    Community Buy-In:

  • Extensive engagement from Day 1
  • Participatory budgeting ownership
  • Responsive to feedback
  • Transparent about challenges
  • Professional Management:

  • Experienced team
  • Detailed project management
  • Regular accountability
  • Data-driven decisions
  • Evidence-Based Approach:

  • Following proven models
  • Continuous evaluation
  • Willingness to adjust
  • Learning from other cities
  • Fiscal Responsibility:

  • Within approved budget
  • No tax increases
  • Regular audits
  • Transparent spending
  • Partnership Approach:

  • Police department collaboration
  • Union partnership
  • Community organizations
  • Healthcare systems
  • Academic institutions
  • THE BOTTOM LINE

    This roadmap proves Louisville’s transformation is achievable.

    βœ… Specific timelines
    βœ… Detailed budgets
    βœ… Clear metrics
    βœ… Accountability measures
    βœ… Risk mitigation
    βœ… Evidence-based approach

    From January 2026 to December 2029:

  • 63 mini substations built and operational
  • 18 wellness centers serving thousands
  • Crime reduced 35%
  • Community transformed
  • Louisville leading the nation

This isn’t a promise. It’s a plan. ????️

rundaverun.org

Budget Implementation Roadmap | Created October 2025 | For Dave Biggers Mayoral Campaign



πŸ“ What This Means for YOUR Neighborhood

Every Louisville neighborhood is unique. Enter your ZIP code to see how this policy directly impacts your community:

Find Your Mini Substation

Enter your ZIP code to see when your neighborhood will receive a community police substation.

63 ZIP code areas across Louisville will receive mini substations over 4 years.

Part of Dave Biggers' comprehensive public safety plan.

πŸ’° See the Budget Impact

Explore how this policy fits into Dave’s comprehensive $1.2 billion budget plan:

How Does Dave's Budget Affect You?

See your personalized impact - zero tax increase, real benefits

Your Personal Impact

How we calculate: Benefits based on average family savings from wellness center access ($800/year), youth program value (after-school + summer jobs), and your specific mini substation timeline. All benefits come from the same $1.2B budget - zero tax increase.

βš–οΈ Compare This Policy

See how Dave’s approach differs from current administration policies:

βš–οΈ Policy Comparison: Real Change vs. Status Quo

See the clear differences between Dave Biggers' transformative vision for Louisville and the current mayor's approach. The choice is yours.

πŸš”

Public Safety & Policing

Current Mayor

Traditional policing model

Approach

  • Centralized police response
  • Reactive approach to crime
  • Limited community engagement
  • Focus on patrol units
Timeline Ongoing
Budget Status quo funding
Impact Response times: 15-20 minutes average

Dave Biggers

Community-based mini substations

Approach

  • 63 mini substations across Louisville (4-year deployment)
  • Officers living and working in communities they serve
  • Preventative community policing model
  • Year 1: 12 substations in highest-need areas
Timeline Year 1-4 phased rollout
Budget Revenue-neutral through property tax restructuring
Impact Response times: 3-5 minutes (neighborhood-based)
πŸ₯

Mental Health & Wellness

Current Mayor

Limited wellness infrastructure

Approach

  • Reliance on existing healthcare facilities
  • No dedicated community wellness centers
  • Fragmented mental health services
  • Emergency-room dependent model
Timeline No expansion planned
Budget Minimal dedicated funding
Impact Long wait times, limited access in underserved areas

Dave Biggers

Regional wellness centers network

Approach

  • 18 wellness centers across 6 regions
  • Mental health counseling, addiction support
  • Youth programs, family services
  • 3 centers per region for accessibility
Timeline Year 1-4 phased rollout
Budget Integrated with public safety restructuring
Impact Accessible care within every neighborhood, preventative focus
πŸŽ“

Youth Development

Current Mayor

Standard recreation programs

Approach

  • Traditional rec centers
  • Limited after-school programming
  • Seasonal sports leagues
  • Minimal job training for youth
Timeline Status quo
Budget Existing recreation budget
Impact Serves fraction of Louisville youth

Dave Biggers

Comprehensive youth investment

Approach

  • After-school programs at all substations
  • Job training and mentorship
  • Arts, sports, and STEM programs
  • Youth advisory councils
  • Summer employment pathways
Timeline Immediate implementation with substation rollout
Budget $1,200 value per child annually
Impact Accessible programs in every neighborhood
πŸ’Ό

Economic Development

Current Mayor

Corporate incentives focus

Approach

  • Tax breaks for large corporations
  • Downtown-centric development
  • Limited support for small business
  • Gentrification without displacement protection
Timeline Ongoing
Budget Millions in corporate subsidies
Impact Benefits concentrated in select areas

Dave Biggers

Community wealth building

Approach

  • Small business incubators at substations
  • Local hiring requirements for city contracts
  • Neighborhood-based economic zones
  • Affordable housing protection
  • Living wage standards
Timeline Immediate policy changes, 4-year infrastructure build
Budget Redirected from corporate subsidies
Impact Jobs and wealth stay in neighborhoods
🏠

Housing & Affordability

Current Mayor

Market-driven housing

Approach

  • Minimal affordable housing requirements
  • Limited tenant protections
  • Rising rents in many neighborhoods
  • Displacement from development
Timeline No comprehensive plan
Budget Minimal housing trust fund
Impact Affordability crisis worsening

Dave Biggers

Housing as a human right

Approach

  • Expanded affordable housing trust fund
  • Strong tenant protections
  • Community land trusts
  • Rent stabilization measures
  • Anti-displacement policies for existing residents
Timeline Immediate policy changes
Budget Increased trust fund through property tax reform
Impact Protects residents, prevents displacement
πŸ“Š

Government Transparency

Current Mayor

Standard reporting

Approach

  • Annual budget reports
  • Limited real-time data
  • Reactive public engagement
  • Closed-door development deals
Timeline Status quo
Budget Minimal transparency infrastructure
Impact Limited public accountability

Dave Biggers

Radical transparency

Approach

  • Real-time budget dashboard
  • Public data portal for all city metrics
  • Community advisory boards with veto power
  • Open contracting process
  • Regular town halls in all neighborhoods
Timeline Immediate implementation
Budget Low-cost digital infrastructure
Impact Citizens empowered with information and decision-making power

The Choice is Clear

Louisville deserves transformative change, not more of the same. Join us in building a city that works for everyone.

πŸ—£οΈ What Louisville Residents Say

[dbpm_testimonials limit=”3″]

βœ… Community Endorsements

[dbpm_endorsements limit=”5″]


Share This Policy

Help spread the word about Dave’s vision for Louisville:

[dbpm_share_buttons]

[policy_recommendations limit=”3″]

πŸ—³οΈ Make Your Voice Heard

Register to Vote

[dbpm_voter_registration]

Find Your Polling Place

[dbpm_polling_locator]

πŸ’‘ Have Ideas to Improve This Policy?

This is YOUR city. If you have suggestions for how we can make this policy better for Louisville, please share them. Every idea is reviewed.

Suggest an Improvement for Louisville

Have an idea for improving Louisville? Share your policy suggestion below. Your voice matters in shaping our city's future.

0/2000 characters

NOT ME, WE.

Together, we make Louisville better for everyone.

Paid for by rundaverun.org • Privacy Policy

Scroll to Top